pdf Most documents are pdfs and will require Adobe Acrobat Reader for online viewing.

 

Flood Control Zones

Zone 1–Novato

Special Assessment FAQs for FCZ1

Vineyard Creek Reports

Vineyard Creek Phase 2 Vegetation Enhancement

Vineyard Creek Phase 2 Vegetation Enhancement 2

Vineyard Creek Phase 2 Vegetation Enhancement 3

pdf Year 1 Vegetation Monitoring Report for Vineyard Creek Restoration Project (May & Associates, 2009)

pdf Year 2 Vegetation Monitoring Report for Vineyard Creek Restoration Project (May & Associates, 2010)

pdf Year 3 Vegetation Monitoring Report for Vineyard Creek Restoration Project (May & Associates, 2011)

pdf Year 4 Vegetation Monitoring Report for Vineyard Creek Restoration Project (May & Associates, 2012)

Year 5 Vegetation Monitoring Report for Vineyard Creek Restoration Project (May & Associates, 2013)

Year 5 Photo-appendix

Vineyard Creek Plants Guide (Marin County Flood Control & Water Conservation District, 2013)

Year 1 Geomorphic Monitoring Report for Vineyard Creek (Kamman Hydrology & Engineering, 2009)

Year 2 Geomorphic Monitoring Report for Vineyrad Creek (Kamman Hydrology & Engineering, 2010)

Year 3 Geomorphic Monitoring Report for Vineyard Creek (Kamman Hydrology & Engineering, 2011)

Year 3 Figures

Year 4 Geomorphic Monitoring Report for Vineyard Creek (Kamman Hydrology & Engineering, 2012)

Year 4 Appendix A

Year 4 Appendix B


Zone 3–Mill Valley

Marin City Flood Drainage Study (Draft)


Zone 4–Bel Aire and Strawberry

Cove Pump Station Scope of Work for an Assessment of the Cove Stormwater Pump Station and Collection System (Nute Engineering, 2015)

Special Assessment FAQs for FCZ4A

Proposed Reliability Memo for the Cove Pump Station

Cove Stormwater Pump Station and Collection System Hydrology and Hydraulic Study

Cove Pump Station FAQs

Cove Pump Station Report

Appendix A - Data Sources

Appendix B - LiDAR Metadata

Appendix C - Rainfall Design Pattern

Appendix D - Hydrology Methodology Memorandum

Appendix E - Percent Impervious

Appendix F - CCTV Inspections

Appendix G - Pump Station Assessment Reports

Appendix H - Pump Curves

Appendix I - CIP Cost Breakdown

Appendix J - Gage Data

 


Zone 7–Santa Venetia

Las Gallinas Creek Levee Evaluation Reports and Documents

Alternatives

Geotechnical Alternatives Analysis, Las Gallinas Levee System, San Rafael, California (Kleinfelder, Inc., 2014)

Economic / Damage Assessment

Las Gallinas Creek, CA - Preliminary Flood Damage Analysis (U.S. Army Corps of Engineers, 2014)

Geotechnical

Geotechnical Data Report - Las Gallinas Levee System - San Rafael, California (Kleinfelder, Inc., 2013)

Hydrology & Hydraulics

Las Gallinas Creek - Hydrologic, Hydraulic and Coastal (U.S. Army Corps of Engineers, 2013)

Letter Report

CAP 205 Program Termination Letter (U.S. Army Corps of Engineers, 2017)

Las Gallinas Creek, CA - Continuing Authorities Program (CAP) - Status of Phase 1 Feasibility Assessment (U.S. Army Corps of Engineers, 2014)

Community Meeting January 29, 2014

Presentation on the Levee Evaluation

Community Meeting Comments and Responses

La Pasada-related Studies

La Pasada Drain Bathymetry (GBA, 2009)

La Pasada photo slideshow PDF

La Pasada Interceptor Drain Improvement Project Area Map PDF

La Pasada TV Inspection preview zipped (compiled from files provided by Roy's Sewer Service, 2010)

Response to Request for Construction Access & Staging for the La Pasada Interceptor Drain Improvement Project (San Rafael Airport, 2013)

Other

Channel Maintenance Dredging Project Study Report (Winzler & Kelly, 2010)

Levee/Floodwall Inspections Report

Gallinas Watershed Program documents

Link to Gallinas Watershed Program Library

__________________________________________________________________________

Zone 9 - Ross Valley Flood Protection & Watershed Program

 

Program Related Reports

Annual Budgets

Budgets as recommended by the Zone 9 Advisory Board are listed below:

2017-2018 (pdf)

2016-2017 (pdf)

2015-2016 (pdf)

2014-2015 (pdf)

2013-2014 (pdf)

2012-2013 (pdf)

2011-2012 (pdf)

2010-2011 (pdf)

County-wide and District budgets as approved by the Board of Supervisors are located on the County's Budget Overview webpage.

Annual Reports

2014-2015 (pdf)

2013-2014 (pdf)

Cost & Revenue Estimates

December 2016 Update (pdf)

September 2015 Update (pdf)

December 2014 Update (pdf)

Newsletters

Spring/Summer 2016

Fall 2015

Storm Drain Fee Reports

2017-2018 Storm Drainage Fee Update Report (pdf)

2016-2017 Storm Drainage Fee Update Report (pdf)

2015-2016 Storm Drainage Fee Update Report (pdf)

2014-2015 Storm Drainage Fee Update Report (pdf)

2013-2014 Storm Drainage Fee Update Report (pdf)

Technical Reports

10-Year Work Plan (costs updated December 16, 2014) (pdf)

Capital Improvement Plan Study Presentation (webpage)

Capital Improvement Plan Study Report (webpage)

Strategic Implementation Plan (pdf)

Ross Valley Flow Reduction Study Report (pdf)

Technical Memorandum No. 2.: Detention Basin Analysis (pdf)

Analysis of Project Alternatives for DWR Grant (pdf)

Technical Memorandum No. 6.: Hydrologic Design Basis (May, 2016 pdf)

Project Related Reports

Lefty Gomez Dual-Use Facility at White Hill School

See project webpage

Stormwater Flood Management Grant Projects (Formerly the Memorial Park Dual-Use Detention Basin Project)

See project webpage

Phoenix Lake Integrated Regional Watershed Management Retrofit Project

See project webpage

US Army Corps of Engineers Corte Madera Creek Project (Units 2, 3, and 4)

See project webpage


Flood Control Maintenance

Stream Maintenance Manual (2017)